Offices having problem in uploading SB KPI's using Account MIS

 Offices having problem in uploading SB KPI's using Account MIS should ensure the following:

In offices where ‘Sanchay Post Project Arrow Interface’ was installed from Meghdoot 6.6 CD uninstall the ‘Sanchay Post Project Arrow Interface’ module and also delete ‘Project arrow reports’ shortcut if available in the desktop. This should be done in all the systems in which the interface was installed.

Ensure that Sanchay Post Version 6.5 is installed.

Use DBAnalyzer to check whether you have upgraded to Version 6.5 successfully.

Use patchstatus.exe to ensure that all the patches available are installed in all the systems running Sanchaypost.

While performing day end ensure that the message ‘Day end completed successfully’ is received.

1 comment:

  1. Very important for Project Arrow Offices:

    It has been learnt By me that figure for the despatch module is not featuring 100 % for the following reasons.

    1. All the articles booked regd/speed post have to be despatched same day.

    2. day end of despatch and speednet has to be performed before point of sale day end strictly.

    3. Sequence for day end for the project arrow
    is
    a. sanchay post
    b. despatch
    c. speed net
    d. point of sale
    e. postman
    f. sbcash
    g. sub a/c
    h. treasury

    Miral Khamar
    Office Supervisor,
    Ahmedabad City Divison